Description
The “ECP” spans the eyewire to press the base curve into the top and bottom of the eyewire simultaneously. Place the eyewire between the matching 6 or 9 base curved blocks and screw snug. The “ECP” can also be used to narrow the bridge for a better fit and to reduce the frame DBL. 3″ W x 7.5″ H x 3.25″ D.